Benchmark for Stadiums

This is an example of Benchmark boilers installation at a Stadium. This installation uses multiple Benchmark boilers to meet large load requirement of turf warming application with increased efficiency.

1.      Isolation Valve

2.      Relief Valve

3.      Manual Shut-off Valve

4.      Heating System Return

5.      1-1.5” NPT Drain Conn.

6.      Gas Supply

7.      Heating System Supply